Standards Compliance: ASTM A53, EN 10219, API 5L, BS 1387

Submit Project BOQ / Material Take-Off (MTO) for Instant Factory Direct Quotation

B2B EPC & Project Contractors Direct Channel

Submit Your Project BOQ / Material Take-Off (MTO)

Get accurate mill-direct FOB & CIF pricing (Tanjung Priok, Tanjung Perak, Batam) within 2 to 4 business hours. Supporting ASTM, JIS, EN, and SNI specifications with Form E 0% tariff certification.

💬 Fast Track: WhatsApp Direct BOQ Upload

Send your Excel/PDF material take-off directly to our senior engineering sales team for immediate calculation.


📲 Send BOQ via WhatsApp (+86 186 2208 8833)

✉️ Formal RFQ: Email Engineering Team

Attach your engineering specifications, drawings, and tender documents for comprehensive commercial review.


📧 Email BOQ to [email protected]

How Sino East Steel Processes Major Project BOQs

1. Technical Spec Review

Cross-verifying chemical compositions, wall thickness tolerances (EN/ASTM/SNI), and required surface coatings (3PE, Galvanized, Primer).

2. Container Load Optimization

Calculating theoretical vs actual bundle weights to maximize 20’GP and 40’HQ container payload (25–27 metric tons per FCL).

3. Direct CIF Freight & Tariff

Securing preferential liner ocean freight to Jakarta, Surabaya, Belawan, and Batam, complete with Form E 0% tariff documentation.

4. Production & MTC Traceability

Scheduling raw billet allocation, batch heat numbering, and pre-dispatch third-party inspection (SGS/BV) coordination.

Scroll to Top